Additional work for T.G
To have 2 Zappi chargers on property -for labour and parts as its 2 installs plus the wiring of the load management system, the commissioning and certification of the entire installation.
Additional work for T.P Installation
20m of SWA required, cleats and gland pack to suit
and two man install
Additional work for CT Installation
Installation from Meter cabinet including additional material and labour
Additional work for EMC Installation
Installation from Meter cabinet including additional material and labour
Additional work for J.J Installation
Installation from Meter cabinet including additional material and labour
Additional work for WF Installation
Installation from Meter cabinet including additional material and labour
Additional work for N.S Installation
This charger to be fed from board in utility room in the middle of the house.
Drill through wall into kitchen run in trunking along ceiling and out gable wall and down to plinth level.
Run along plinth to charger location beside meter cabinet.
additional 18 meters of SWA needed.
Additional work for C.H Installation
Will need 30 metres of SWA cable to be routed through two attics, two person job due to scope of work required.