Additional work for S.N
The cable length needed for this run would be at least 32 metres of SWA cable.
The cable is to be installed and clipped tight to the fascia.
The charging point is at the front of the house whereas the fuse board is at the back.
This is a different location compared to the ESB cabinet.
The attic is converted into bedrooms so there is no room to run cables through there.
Additional work for T.G
To have 2 Zappi chargers on property -for labour and parts as its 2 installs plus the wiring of the load management system, the commissioning and certification of the entire installation.
Additional work for T.P Installation
20m of SWA required, cleats and gland pack to suit
and two man install
Additional work forBW
Surveyed route not possible.
Down from soffit to isolator located on front end of gable wall.
20 meters of SWA needed long ladders and a second man to complete this job.