Filter by price
All Products
Additional work for I.S Installation -
Long cable run-Job needs 15 meters of a cable run. 4 lengths of mini trunking. Surge and 32 amp.This is an all day install due to route.
€388.94
Additional work for J.J Installation
Installation from Meter cabinet including additional material and labour
€220
Additional work for WF Installation
Installation from Meter cabinet including additional material and labour
€220
Additional work for N.S Installation
This charger to be fed from board in utility room in the middle of the house.
Drill through wall into kitchen run in trunking along ceiling and out gable wall and down to plinth level.
Run along plinth to charger location beside meter cabinet.
additional 18 meters of SWA needed.
€273.6

