All Products

View as Grid List
Sort by
Display per page

Additional work for N.S Installation

This charger to be fed from board in utility room in the middle of the house. 

Drill through wall into kitchen run in trunking along ceiling and out gable wall and down to plinth level. 

Run along plinth to charger location beside meter cabinet. 

additional 18 meters of SWA needed. 

€273.6

Additional work for O.C Installation

17 meters of SWA cable needed

€194

Additional work for N.C Installation

15-20 m of SWA required 

€188.6

Additional work for A.G Installation

25 meters of SWA cable and two men plus long ladders. 

€603

Additional work for B.T Installation

22 meters of SWA cable.

€358.91

Additional work for C.OR

Install Zappi with sub‑board, SWA upgrade, and 30m CAT6 load management
 
5 meters of SWA
€219.8