Additional work for M.B Installation

This charger to be fed from board in utility room in the middle of the house. 

Drill through wall into kitchen run in trunking along ceiling and out gable wall and down to plinth level. 

Run along plinth to charger location beside meter cabinet. 

additional 18 meters of SWA needed. 

€460
Ship to
*
*
Shipping Method
Name
Estimated Delivery
Price
No shipping options
Instruction Video

This charger to be fed from board in utility room in the middle of the house. 

Drill through wall into kitchen run in trunking along ceiling and out gable wall and down to plinth level. 

Run along plinth to charger location beside meter cabinet. 

additional 18 meters of SWA needed. 