Additional work for L.M Installation -

Install needs 14 meters of swa cable.

Charger to be sourced from fuse board to right of front door. 

Drill out back of fuse board up and over arch drill out above plinth level . 

Run cable along plinth through wall and to the left to middle of gable wall where the charger is to be located. 

Charger is fitted in an area with shared parking behind gates, charger will need to be a socket unit.

€146.2

Additional work for C.H Installation

Will need 30 metres of SWA cable  to be routed through two attics, two person job due to scope of work required.

€395