The cable length needed for this run would be at least 32 metres of SWA cable. 
The cable is to be installed and clipped tight to the fascia. 
The charging point is at the front of the house whereas the fuse board is at the back. 
This is a different location compared to the ESB cabinet.
The attic is converted into bedrooms so there is no room to run cables through there.