Filter by price
All Products
Additional work for K.J
22 meters of SWA required.
New 4 mod board to be fitted beside existing fuse board.
Breakout to back of house cleat cable above patio door to gable end come down beside down pipe & cleat along plint to front corner beside meter cabinet.
€336.8
Additional work for T.G
To have 2 Zappi chargers on property -for labour and parts as its 2 installs plus the wiring of the load management system, the commissioning and certification of the entire installation.
€355
Additional work for T.P Installation
20m of SWA required, cleats and gland pack to suit
and two man install
€358.6