Option 1-
This charger is to be fed from sub panel fed by 3x10 SWA cable.
Drill out through back wall and into duct to be installed by customer- ducting to be done prior to installation.
Once through duct cable to run along wall at low level going around several pillars to charger location at garage.
Cat 6 external cable will have to be run passed sub panel and clipped around to front of house and to be drilled in beside front door to meter location inside the front hall.
35 meters of SWA cable will be needed .
57meters of external cat 6 to reach main board at front of the house.
Drill out through back wall and into duct to be installed by customer-ducting to be done prior to installation.