Install needs 14 meters of swa cable.
Charger to be sourced from fuse board to right of front door.
Drill out back of fuse board up and over arch drill out above plinth level .
Run cable along plinth through wall and to the left to middle of gable wall where the charger is to be located.
Charger is fitted in an area with shared parking behind gates, charger will need to be a socket unit.