Cable run needed is 30m of SWA cable.
It’s going to be ran through an attic to the charger then dropped through conduit down to the isolator.
Notice of hazard for the customer as the bottom of the fuseboard cover was cracked and had a hole in it.
Issue to be fixed before return.