Additional work for C.B

45m of SWA required, including multiple wall penetrations along the cable route.

€910.2
Ship to
*
*
Shipping Method
Name
Estimated Delivery
Price
No shipping options
Instruction Video
  • Customer is having solar installed prior to EV charger installation and will leave draw wires in place and drill required access holes along the cable route.
  • 45m cable run required.
  • Cable route to run through the boiler room, externally up the rear wall, through two attic spaces, back out to the front of the property, along the soffit, and down alongside the black waste pipe.
  • Customer will install a suitable concrete mounting board on the stone wall for the EV charger and isolator.
  • Two-person installation team required due to cable route complexity.
  • Long ladders required to safely access the proposed cable route and installation locations.

 

Only registered users can write reviews