Additional work for B.B

42 meters of SWA required 

€602.35
Ship to
*
*
Shipping Method
Name
Estimated Delivery
Price
No shipping options
Instruction Video

This is a non-standard EV charger installation requiring a 2-person team due to the complexity of the cable route and installation requirements.

  • Approximately 42m of SWA cable required from the consumer unit/fuse board.
  • Cable route starts in the utility area, passes through to the kitchen via drilled access, then runs in 2x2 trunking along the skirting board.
  • Cable will then exit to the garden and be surface clipped along an external wall to the charger location.
  • Customer does not have a dedicated parking space, so an untethered charger may be more suitable.
  • Wi-Fi signal at the charger location is insufficient, therefore Wi-Fi boosters/extenders will likely be required to ensure charger connectivity.
  • Due to the cable length, routing complexity, drilling, trunking, and external works, this should be treated as a 2-man installation rather than a standard install.

 