16‑meter SWA cable run — Cable to be routed from the main board location to the charger position.
16mm tails into main board — New tails will be brought into the existing board as part of the upgrade.
Sub‑board with SPD — A new sub‑board including surge protection is required for compliance and safe distribution.
Drill through wall at sub‑board — A hole will be drilled through the wall to route the SWA externally.
Cleated along top of outside wall — Cable will be clipped neatly along the top of the exterior wall, running right toward the garage and charger location.
Switches & overload protection outdated — Customer has been advised to replace outdated switches and overload protection; customer has agreed to complete this before installation.
Earth rod not present — No earth rod visible on site; customer believes it may be under the footpath and this will need verification.