Additional work for N.B Installation

The install will need two technicians on site

There is going to be a 30 meter run of cable needed

Customer is going to remove the coving from fuseboard location in the back of the property to the front prior to install.

It will run from the utility room in the back of the property  through to the kitchen in through the sitting room out through external wall to charger location.

 

€355
Ship to
*
*
Shipping Method
Name
Estimated Delivery
Price
No shipping options
Instruction Video

The install will need two technicians on site

There is going to be a 30 meter run of cable needed

Customer is going to remove the coving from fuseboard location in the back of the property to the front prior to install.

It will run from the utility room in the back of the property  through to the kitchen in through the sitting room out through external wall to charger location.

Only registered users can write reviews