The install will need two technicians on site
There is going to be a 30 meter run of cable needed
Customer is going to remove the coving from fuseboard location in the back of the property to the front prior to install.
It will run from the utility room in the back of the property through to the kitchen in through the sitting room out through external wall to charger location.